GENEL BAKIŞ

Engineered once, deployable many times.

A project-based commercial modular unit is a fully custom modular building engineered to a specific client brief — site constraints, architectural vision, commercial programme, fit-out standard — rather than drawn from a standard catalogue. structmod design-build engineering handles every stage from initial concept sketches through detail engineering, factory production, logistics, site assembly, MEP commissioning and handover, taking commercial accountability for the complete project outcome rather than a discrete component.

Typical project-based briefs include corporate headquarters buildings on constrained urban sites, flagship retail stores with distinctive architectural identity, boutique hospitality units (20-60 room hotels, branded resorts), mixed-use buildings combining ground-floor retail with upper-floor offices or apartments, and specialised commercial buildings (broadcasting studios, training centres, showrooms) with unique functional requirements. Each project begins with a design workshop where the structmod engineering team, your architect, and your commercial team work through requirements, constraints, site conditions and target programme to produce a module schedule and technical proposal.

Design-build delivery means structmod takes single-point responsibility for the complete project — no separation between architect, engineer, manufacturer, and contractor. This eliminates the interface risk that drives overruns on conventional commercial construction and enables the full benefits of modular: predictable schedule, fixed-price delivery, and factory-quality finishes. Typical project-based commercial modular unit delivers in 8-14 months from contract to operational handover, with factory production running in parallel with site works. Every project includes EN 1090 structural documentation, Eurocode 8 seismic analysis, destination-country fire compliance, and CE-marked components throughout.

Tipik Konuşlanma Sırası

  1. Ay 1 — saha hazırlığı, temel çalışmaları, altyapı hendekleri
  2. Ay 2–3 — ana çelik taşıyıcı montajı (EN 1090)
  3. Ay 3–5 — zarf kapatma, çatı, perde duvar
  4. Ay 5–7 — MEP kaba tesisatı, tıbbi gaz, acil güç
  5. Ay 7–10 — iç donanım, ekipman kurulumu
  6. Ay 10–12 — devreye alma, FAT/SAT, kullanıcı eğitimi
  7. Ay 12 — tam İ&B dosyasıyla klinik teslimat
TEKNİK ÖZELLİKLER

Spec sheet — STR-3706

Toplam uzunluk14.6 m · 47.9 ft
Genişlik (nakliye)2,99 m
Genişlik (konuşlandırılmış)2,99 m
Yükseklik (nakliye)3.10 m
Zemin alanı (konuşlandırılmış)43.7 m²
Boş ağırlık16.6 t
ŞasiEN 10025 S355JR sıcak hadde çelik · EN 1090
Kaynak kalitesiEN ISO 3834-2 · sertifikalı kaynak koordinatörü (IWE)
ZarfSandviç panel, PIR çekirdek 80 mm · λ ≈ 0,023 W/(m·K)
Yangın direnciEI-30 · EN 13501-2'ye göre test edilmiş
ZeminEPDM üzerine denizcilik kontrplak · R-10 kayma sınıfı
Elektrik tesisatı400 V / 50 Hz · 3 fazlı · IEC 60364 uyumlu
İklimlendirmeVRF çok bölmeli · HEPA H13 (tıbbi)
Çalışma aralığı−25 °C ile +50 °C ortam
Rüzgar sınıfı140 km/s temel rüzgar için tasarlandı (EN 1991-1-4)
Sismik tasarımEN 1998-1 (Eurokod 8) uyarınca · sünek sınıf DCM
NakliyeISO 668 ayak izi · CSC plakası uygun (konteyner varyantlar)
Kurulum süresi3 saat · 2 kişilik ekip

Tam çizimler, hesap notları, DoP, İ&B kılavuzu ve FAT raporu her ünite ile dahildir. Özellikler gösterge niteliğindedir — proje gereksinimlerine göre yapılandırılabilir.

İLGİLİ ÜRÜNLER

More from commercial

WhatsApp ile sohbet