GENEL BAKIŞ

Engineered once, deployable many times.

A project-based commercial trailer is a custom-engineered mobile commercial facility designed around a specific business case — industry sector, operational workflow, equipment integration, and regulatory environment — rather than drawn from a catalogue. structmod design-build delivery for commercial trailers begins with the operating organisation's business brief (target operation, revenue model, equipment list, regulatory environment) and ends with a commissioned mobile unit ready for commercial use. Custom commercial trailers serve businesses where catalogue products don't match the specific need — retail pop-up operations, specialty business concepts, technology demonstration units, mobile research and development platforms, and industry-specific operational units.

Typical custom project briefs include: retail pop-up concepts (specialty retail, food service, beverage brands extending brand presence mobilely), specialty business operations (mobile specialty shops, artisan craft demonstrations, boutique services), technology demonstration units (product showcase trailers for industrial or commercial products), mobile research and development platforms (product testing, focus group facilities, user research environments), and industry-specific operational units (agricultural equipment, marine services, specialty construction services). Design begins with a business workshop where structmod engineering, the operating business team, and any specialist consultants work through requirements before detail engineering begins.

structmod project-based commercial trailers serve operators across commercial niches — retail brands running pop-up programmes to test new markets, specialty businesses building mobile concepts as business expansion, technology companies running demonstration programmes supporting sales campaigns, market research and user experience organisations conducting field research, and specialty service providers offering mobile capability to their customers. Lead time is 14-18 weeks from contract signature for typical custom projects, longer for complex configurations with extensive equipment integration. Compliance includes destination-country commercial operation regulation, IEC 60364-1 commercial electrical, DOT/E-mark vehicle homologation, and any industry-specific regulatory framework.

Tipik Konuşlanma Sırası

  1. Saat 0 — römork çekici araçla gelir, konumlandırılır ve takoz vurulur
  2. Saat 0–1 — dengeleme krikoları açılır, tesviye doğrulanır
  3. Saat 1–2 — hidrolik duvarlar veya genişleme panelleri açılır
  4. Saat 2–3 — altyapı bağlantıları (elektrik, su, atık su)
  5. Saat 3–4 — FAT protokolüne göre işlevsel test
  6. Saat 4 — kullanıcı eğitimiyle operasyonel teslimat
TEKNİK ÖZELLİKLER

Spec sheet — STR-3212

Toplam uzunluk13.2 m · 43.3 ft
Genişlik (nakliye)2,55 m
Genişlik (konuşlandırılmış)5.00 m
Yükseklik (nakliye)2,90 m
Zemin alanı (konuşlandırılmış)66.0 m²
Boş ağırlık17.2 t
ŞasiEN 10025 S355JR sıcak hadde çelik · EN 1090 EXC-2
Kaynak kalitesiEN ISO 3834-3
ZarfSandviç panel, PIR çekirdek 80 mm · λ ≈ 0,023 W/(m·K)
Yangın direnciEI-30 · EN 13501-2'ye göre test edilmiş
ZeminEPDM üzerine denizcilik kontrplak · R-10 kayma sınıfı
Elektrik tesisatı120/240 V · 60 Hz (ABD spec) · IEC 60364 uyumlu
İklimlendirmeÇatı üstü paket cihaz · MERV-13
Çalışma aralığı−25 °C ile +50 °C ortam
Rüzgar sınıfı150 km/s temel rüzgar için tasarlandı (EN 1991-1-4)
NakliyeISO 668 ayak izi · CSC plakası uygun (konteyner varyantlar)
Kurulum süresi4 saat · 2 kişilik ekip

Tam çizimler, hesap notları, DoP, İ&B kılavuzu ve FAT raporu her ünite ile dahildir. Özellikler gösterge niteliğindedir — proje gereksinimlerine göre yapılandırılabilir.

İLGİLİ ÜRÜNLER

Daha fazla mobil römork

WhatsApp ile sohbet