GENEL BAKIŞ

Engineered once, deployable many times.

A project-based expandable trailer is a custom-engineered pop-out trailer designed around a specific operational need — hydraulic pop-out configuration, specialised interior fit-out, equipment integration, and regulatory environment — rather than drawn from a catalogue. structmod design-build delivery for expandable trailers begins with the operating organisation's brief (target operation, deployed footprint requirement, interior functional needs, equipment list, regulatory framework) and ends with a commissioned expandable unit ready for operational use. Custom expandable trailers serve operations where catalogue expandable products don't match the specific need — specialty clinical configurations beyond standard medical trailers, specialty laboratory or research configurations, specialty command and control configurations, and unique operational requirements.

Typical custom expandable project briefs include: specialty clinical trailers (specific single-disease clinics, rare specialty consultation, bespoke research site trailers), specialty laboratory configurations (unique equipment integration, specific clean room requirements, specialty BSL or high-containment work), specialty command and control configurations (specific communications architecture, unique intelligence integration, national doctrine-specific workflow), and unique operational requirements (specialty broadcasting, specialty entertainment production, bespoke industrial applications). Design begins with an operational workshop where requirements work through before detail engineering.

structmod project-based expandable trailers serve operators across specialty niches — specialty medical programmes requiring bespoke clinical configuration, research organisations running specialty field campaigns, defence forces requiring mission-specific expandable capability, and specialty industrial operators requiring expandable working environments. Lead time is 16-22 weeks from contract signature for typical custom projects — longer than catalogue due to expandable engineering complexity. Hydraulic deployment per Machinery Directive 2006/42/EC, EN 1090 EXC-2 chassis, IEC 60364-1 commercial or IEC 60364-7-710 medical electrical per application, and any operation-specific regulatory framework.

Tipik Konuşlanma Sırası

  1. Saat 0 — römork çekici araçla gelir, konumlandırılır ve takoz vurulur
  2. Saat 0–1 — dengeleme krikoları açılır, tesviye doğrulanır
  3. Saat 1–2 — hidrolik duvarlar veya genişleme panelleri açılır
  4. Saat 2–3 — altyapı bağlantıları (elektrik, su, atık su)
  5. Saat 3–4 — FAT protokolüne göre işlevsel test
  6. Saat 4 — kullanıcı eğitimiyle operasyonel teslimat
TEKNİK ÖZELLİKLER

Spec sheet — STR-3204

Toplam uzunluk12.4 m · 40.7 ft
Genişlik (nakliye)2,55 m
Genişlik (konuşlandırılmış)5.00 m
Yükseklik (nakliye)2.70 m
Zemin alanı (konuşlandırılmış)62.0 m²
Boş ağırlık9.4 t
ŞasiEN 10025 S355JR sıcak hadde çelik · EN 1090 EXC-2
Kaynak kalitesiEN ISO 3834-3
ZarfSandviç panel, PIR çekirdek 80 mm · λ ≈ 0,023 W/(m·K)
Yangın direnciEI-30 · EN 13501-2'ye göre test edilmiş
ZeminEPDM üzerine denizcilik kontrplak · R-10 kayma sınıfı
Elektrik tesisatı230 V / 50 Hz · TN-S · IEC 60364 uyumlu
İklimlendirmeSplit inverter ısı pompası · MERV-8
Çalışma aralığı−25 °C ile +50 °C ortam
Rüzgar sınıfı130 km/s temel rüzgar için tasarlandı (EN 1991-1-4)
NakliyeISO 668 ayak izi · CSC plakası uygun (konteyner varyantlar)
Kurulum süresi2–4 saat · 2 kişilik ekip

Tam çizimler, hesap notları, DoP, İ&B kılavuzu ve FAT raporu her ünite ile dahildir. Özellikler gösterge niteliğindedir — proje gereksinimlerine göre yapılandırılabilir.

İLGİLİ ÜRÜNLER

Daha fazla genişleyebilir römork

WhatsApp ile sohbet