Engineered once, deployable many times.
A project-based medical trailer is a custom-engineered mobile medical unit designed around a specific clinical programme — clinical specialty, equipment integration, geographical deployment context, regulatory framework — rather than drawn from a catalogue. structmod design-build delivery for medical trailers begins with the operating organisation's clinical brief (target patient population, clinical pathway, equipment list, regulatory environment) and ends with a commissioned mobile unit ready for clinical use. Custom medical trailers serve clinical programmes where catalogue products don't match the specific need: specialty consultation services, niche diagnostic capabilities, rare disease screening, research protocol delivery, and specialised clinical research operations.
Typical custom project briefs include: specialty single-disease clinics (diabetes specialist clinic, heart failure clinic, COPD clinic), rare disease diagnostic capability (combining genetic testing, specialty imaging, multi-specialist consultation), clinical research delivery (study site infrastructure for clinical trials, pharmacokinetic sampling, controlled-environment study procedures), equipment-specific integration (specific OEM platform integration where catalogue trailers don't match), and unique regulatory contexts (specific national regulatory requirements, religious or cultural workflow adaptations, military-specific requirements). Design begins with a clinical workshop where structmod engineering, the operating clinical team, and any specialist consultants work through requirements before detail engineering begins.
structmod project-based medical trailers serve operators across healthcare niches — specialty pharmaceutical companies running clinical trial site networks, specialty disease management organisations (oncology, cardiology, diabetes specialty providers), national rare disease programmes establishing diagnostic capability across regions, research institutions running multi-site clinical research, and specialty private healthcare operators delivering distinctive clinical services. Lead time is 14-20 weeks from contract signature for typical custom projects, longer for complex configurations with extensive equipment integration. Compliance includes destination-country medical device regulation, IEC 60364-7-710 medical electrical, and any clinical-programme-specific regulatory framework.
Tipik Konuşlanma Sırası
- Saat 0 — römork çekici araçla gelir, konumlandırılır ve takoz vurulur
- Saat 0–1 — dengeleme krikoları açılır, tesviye doğrulanır
- Saat 1–2 — hidrolik duvarlar veya genişleme panelleri açılır
- Saat 2–3 — altyapı bağlantıları (elektrik, su, atık su)
- Saat 3–4 — FAT protokolüne göre işlevsel test
- Saat 4 — kullanıcı eğitimiyle operasyonel teslimat
Spec sheet — STR-2879
| Toplam uzunluk | 15.9 m · 52.2 ft |
|---|---|
| Genişlik (nakliye) | 2,99 m |
| Genişlik (konuşlandırılmış) | 2,99 m |
| Yükseklik (nakliye) | 3.20 m |
| Zemin alanı (konuşlandırılmış) | 47.5 m² |
| Boş ağırlık | 17.9 t |
| Şasi | EN 10025 S355JR sıcak hadde çelik · EN 1090 EXC-2 |
| Kaynak kalitesi | EN ISO 3834-3 |
| Zarf | Sandviç panel, PIR çekirdek 80 mm · λ ≈ 0,023 W/(m·K) |
| Yangın direnci | EI-30 · EN 13501-2'ye göre test edilmiş |
| Zemin | EPDM üzerine denizcilik kontrplak · R-10 kayma sınıfı |
| Elektrik tesisatı | 120/240 V · 60 Hz (ABD spec) · IEC 60364 uyumlu |
| İklimlendirme | Çatı üstü paket cihaz · MERV-13 |
| Çalışma aralığı | −25 °C ile +50 °C ortam |
| Rüzgar sınıfı | 150 km/s temel rüzgar için tasarlandı (EN 1991-1-4) |
| Nakliye | ISO 668 ayak izi · CSC plakası uygun (konteyner varyantlar) |
| Kurulum süresi | 2–4 saat · 2 kişilik ekip |
Tam çizimler, hesap notları, DoP, İ&B kılavuzu ve FAT raporu her ünite ile dahildir. Özellikler gösterge niteliğindedir — proje gereksinimlerine göre yapılandırılabilir.