GENEL BAKIŞ

Engineered once, deployable many times.

A project-based military modular solution is a custom-engineered modular facility or complex designed around a specific defense mission — forward operating base, training establishment, clinical capability, command and control centre, or specialised capability such as CBRN response or special operations support. structmod design-build for defense integrates all disciplines — architecture, structural, MEP, security engineering, communications, CBRN, ballistic protection where specified — into a single coordinated solution that addresses the operational mission rather than just providing a building.

Typical defense modular solutions include barracks and accommodation for 50-5,000 personnel with full life-support infrastructure (mess, ablutions, laundry, medical, recreation), headquarters buildings with classified-communications-ready operations rooms, clinical facilities from battalion aid stations through Role 2+ field hospitals to fixed-base garrison health centres, specialised capabilities (vehicle maintenance, weapons storage, simulator facilities, CBRN response centres), and training establishments (classrooms, simulators, accommodation for instructional cadres). Each solution is engineered to the client's operational doctrine and national defense standards.

structmod is NATO CAGE registered and works with NATO member defense ministries, allied nations' armed forces, UN peacekeeping procurement chains, and defense prime contractors. Project documentation includes compliance matrices against STANAG and AMedP references (STANAG 2345 MEDEVAC, STANAG 2560 medical evaluation, STANAG 4447 CBRN, AMedP-9.1 modular medical), national defense engineering standards, and security classification handling from unclassified through restricted. Delivery integrates with defense logistics chains — modules can be packed to MIL-STD transport specifications and deployed by military airlift, sea lift or ground transport.

Tipik Konuşlanma Sırası

  1. Ay 1 — saha hazırlığı, temel çalışmaları, altyapı hendekleri
  2. Ay 2–3 — ana çelik taşıyıcı montajı (EN 1090)
  3. Ay 3–5 — zarf kapatma, çatı, perde duvar
  4. Ay 5–7 — MEP kaba tesisatı, tıbbi gaz, acil güç
  5. Ay 7–10 — iç donanım, ekipman kurulumu
  6. Ay 10–12 — devreye alma, FAT/SAT, kullanıcı eğitimi
  7. Ay 12 — tam İ&B dosyasıyla klinik teslimat
TEKNİK ÖZELLİKLER

Spec sheet — STR-3974

Toplam uzunluk13.4 m · 44.0 ft
Genişlik (nakliye)2,99 m
Genişlik (konuşlandırılmış)2,99 m
Yükseklik (nakliye)2,90 m
Zemin alanı (konuşlandırılmış)40.1 m²
Boş ağırlık14.4 t
ŞasiEN 10025 S355JR sıcak hadde çelik · EN 1090
Kaynak kalitesiEN ISO 3834-2 · sertifikalı kaynak koordinatörü (IWE)
ZarfSandviç panel, PIR çekirdek 80 mm · λ ≈ 0,023 W/(m·K)
Yangın direnciEI-30 · EN 13501-2'ye göre test edilmiş
ZeminEPDM üzerine denizcilik kontrplak · R-10 kayma sınıfı
Elektrik tesisatı120/240 V · 60 Hz (ABD spec) · IEC 60364 uyumlu
İklimlendirmeÇatı üstü paket cihaz · MERV-13
Çalışma aralığı−25 °C ile +50 °C ortam
Rüzgar sınıfı150 km/s temel rüzgar için tasarlandı (EN 1991-1-4)
Sismik tasarımEN 1998-1 (Eurokod 8) uyarınca · sünek sınıf DCM
NakliyeISO 668 ayak izi · CSC plakası uygun (konteyner varyantlar)
Kurulum süresiSahada 4–16 hafta

Tam çizimler, hesap notları, DoP, İ&B kılavuzu ve FAT raporu her ünite ile dahildir. Özellikler gösterge niteliğindedir — proje gereksinimlerine göre yapılandırılabilir.

İLGİLİ ÜRÜNLER

More from military & defense

WhatsApp ile sohbet