GENEL BAKIŞ

Engineered once, deployable many times.

A project-based modular hospital is a custom-engineered healthcare facility built to the specific clinical brief of the procuring authority — ministry of health, university teaching hospital, private healthcare operator, or international development partner. structmod design-build delivery begins with the functional programme (departmental schedule, bed mix, case mix, outpatient throughput, diagnostic capability) and ends with a commissioned, clinically-certified hospital that matches the brief exactly — not a standard catalogue product adapted to the site.

The design process starts with a clinical workshop where structmod medical planners, your clinical team, the host-country ministry of health representative, and any retained consultants (infection control, medical equipment, biomedical engineering) work through the functional programme floor by floor, room by room, until every clinical adjacency, utility requirement, equipment footprint and compliance standard is documented. This becomes the design brief that drives architecture, structural, MEP, and fit-out engineering through to the full tender package. Every decision is traceable to a clinical or compliance requirement, which protects the project from scope creep and de-risks approval processes.

structmod delivers project-based modular hospitals across healthcare niches: primary care and outpatient-focused hospitals (typically 20-80 beds), district general hospitals with comprehensive secondary care (80-200 beds), tertiary referral hospitals with specialty services (200-500 beds), specialty hospitals (cardiac, maternity, paediatric, oncology) and expansion wings integrated into existing hospital campuses. Every project is engineered to destination-country building codes, Eurocode 8 seismic, IEC 60364-7-710 medical electrical, ministry-of-health departmental standards, and applicable infection control guidelines (CDC, ECDC, HBN UK, or national equivalent). Lead time is 8-18 months from contract signature depending on project scale and regulatory complexity.

Tipik Konuşlanma Sırası

  1. Ay 1 — saha hazırlığı, temel çalışmaları, altyapı hendekleri
  2. Ay 2–3 — ana çelik taşıyıcı montajı (EN 1090)
  3. Ay 3–5 — zarf kapatma, çatı, perde duvar
  4. Ay 5–7 — MEP kaba tesisatı, tıbbi gaz, acil güç
  5. Ay 7–10 — iç donanım, ekipman kurulumu
  6. Ay 10–12 — devreye alma, FAT/SAT, kullanıcı eğitimi
  7. Ay 12 — tam İ&B dosyasıyla klinik teslimat
TEKNİK ÖZELLİKLER

Spec sheet — STR-3029

Toplam uzunluk14.9 m · 48.9 ft
Genişlik (nakliye)2,99 m
Genişlik (konuşlandırılmış)2,99 m
Yükseklik (nakliye)3.20 m
Zemin alanı (konuşlandırılmış)44.6 m²
Boş ağırlık14.9 t
ŞasiEN 10025 S355JR sıcak hadde çelik · EN 1090
Kaynak kalitesiEN ISO 3834-2 · sertifikalı kaynak koordinatörü (IWE)
ZarfSandviç panel, PIR çekirdek 80 mm · λ ≈ 0,023 W/(m·K)
Yangın direnciEI-30 · EN 13501-2'ye göre test edilmiş
ZeminEPDM üzerine denizcilik kontrplak · R-10 kayma sınıfı
Elektrik tesisatı120/240 V · 60 Hz (ABD spec) · IEC 60364 uyumlu
İklimlendirmeÇatı üstü paket cihaz · MERV-13
Çalışma aralığı−25 °C ile +50 °C ortam
Rüzgar sınıfı150 km/s temel rüzgar için tasarlandı (EN 1991-1-4)
Sismik tasarımEN 1998-1 (Eurokod 8) uyarınca · sünek sınıf DCM
NakliyeISO 668 ayak izi · CSC plakası uygun (konteyner varyantlar)
Kurulum süresiSahada 4–16 hafta

Tam çizimler, hesap notları, DoP, İ&B kılavuzu ve FAT raporu her ünite ile dahildir. Özellikler gösterge niteliğindedir — proje gereksinimlerine göre yapılandırılabilir.