OVERVIEW

Engineered once, deployable many times.

A multi-storey modular commercial building is a 2-4 storey office, retail or mixed-use building assembled from volumetric modules that stack on an EN 1090 structural steel frame. structmod multi-storey commercial units integrate the lift shaft, stair core, curtain-wall facade and services risers into the modular system — so what ships from the factory is not individual rooms but a complete vertical building, ready to operate once the modules are connected and the site interfaces are closed.

The structural steel frame is site-erected first, forming the skeleton that supports the modules and accommodates the vertical circulation cores. Modules — offices, meeting rooms, retail units, washroom blocks — slot into the frame in planned sequence, typically one floor per day for a 2,000-4,000 m² footprint. The curtain-wall system installs in parallel, providing weather closure before internal fit-out begins. Mechanical and electrical risers in the core connect to horizontal distribution pre-installed in each module, minimising on-site MEP work.

structmod multi-storey commercial buildings deliver to clients who need commercial real estate on a construction schedule that conventional building cannot match — typically 8-12 months from contract to operational handover versus 18-30 months for conventional construction. Applications include corporate headquarters expansion, retail anchors in new developments, mixed-use ground-retail-office blocks, and flagship buildings for organisations that need a premium commercial presence without the conventional construction timeline. Seismic design follows Eurocode 8 with TBDY 2019 compliance for Turkish projects; other national codes apply per destination country.

Typical deployment sequence

  1. Month 1 — site preparation, foundation works, utilities trenching
  2. Month 2–3 — primary steel structure erection (EN 1090)
  3. Month 3–5 — envelope closure, roofing, curtain wall
  4. Month 5–7 — MEP rough-in, medical gas, emergency power
  5. Month 7–10 — interior fit-out, equipment installation
  6. Month 10–12 — commissioning, FAT/SAT, user training
  7. Month 12 — clinical handover with full O&M dossier
TECHNICAL SPECIFICATION

Spec sheet — STR-2868

Overall length14.8 m · 48.6 ft
Width (transport)2.99 m
Width (deployed)2.99 m
Height (transport)2.70 m
Floor area (deployed)44.3 m²
Dry weight15.8 t
ChassisEN 10025 S355JR hot-rolled steel · EN 1090
Welding qualityEN ISO 3834-2 · certified RWC (IWE)
EnvelopeSandwich panel, PIR core 80 mm · λ ≈ 0.023 W/(m·K)
Fire resistanceEI-30 · tested to EN 13501-2
FloorMarine plywood on EPDM · R-10 slip rating
Electrical230 V / 50 Hz · TN-S · IEC 60364 compliant
HVACSplit inverter heat pump · MERV-8
Operating range−25 °C to +50 °C ambient
Wind ratingDesigned for 130 km/h basic wind (EN 1991-1-4)
Seismic designPer EN 1998-1 (Eurocode 8) · ductility class DCM
TransportISO 668 footprint · CSC plate eligible (container variants)
Setup time5 hours · 2-person crew

Full drawings, calculation notes, DoP, O&M manual and FAT report included with every unit. Specs indicative — configurable to project requirements.