OVERVIEW

Engineered once, deployable many times.

A mobile toilet trailer is a road-deployable sanitary facility configured with toilet cubicles, urinals, hand-wash basins, ventilation infrastructure and onboard waste management for event sites, workforce camps, and temporary public sanitary provision. structmod mobile toilet trailers serve event organisers providing premium sanitary infrastructure at festivals, sporting events and political rallies, workforce camp operators, construction project camps, public event operators, and humanitarian deployments (refugee camps, disaster response staging).

Standard configurations support 4, 6, 8 or 12 plumbing fixtures depending on serving population. Fixture mix typically follows: male side (typically 1 toilet cubicle + 2 urinals + 1 hand-wash basin per 4 users), female side (2 toilet cubicles + 1 hand-wash basin per 4 users), accessibility-compliant cubicle (1 per fixture group with appropriate space, grab rails and door width), and optional family/baby-change cubicle for public-use installations. Plumbing infrastructure includes appropriate water supply (mains connection or onboard tank), hot water for hand-washing where specified, drainage to mains sewer or onboard holding tank (typical 1,500-3,000 L capacity for autonomous operation), ventilation extract from toilet zones (typical 8-12 air changes per hour), and accessibility compliance per ADA equivalent.

structmod mobile toilet trailers serve a range of sanitary provision needs — premium event sanitary provision (where portable chemical toilets are insufficient for guest expectations or event duration), workforce camp toilet blocks deploying with accommodation, public sanitary provision at temporary sites (pop-up markets, public events, tourism peak seasons), and humanitarian deployment per UNHCR/Sphere standards (1 toilet per 20 refugees minimum in emergency phase, 1 per 5-10 in protracted situations). Lead time is 6-10 weeks from contract signature. EN 1090 EXC-2 chassis, DOT/E-mark vehicle homologation, IEC 60364-7-701 wet-area electrical, accessibility per ADA equivalent.

Typical deployment sequence

  1. Hour 0 — trailer arrives on tow vehicle, positioned and chocked
  2. Hour 0–1 — stabilizer jacks deployed, leveling verified
  3. Hour 1–2 — hydraulic walls or slide-outs extended where fitted
  4. Hour 2–3 — utility connections (power, water, wastewater)
  5. Hour 3–4 — functional test per FAT protocol
  6. Hour 4 — operational handover with user training
TECHNICAL SPECIFICATION

Spec sheet — STR-2397

Overall length15.7 m · 51.5 ft
Width (transport)2.55 m
Width (deployed)7.50 m
Height (transport)3.00 m
Floor area (deployed)117.8 m²
Dry weight12.7 t
ChassisEN 10025 S355JR hot-rolled steel · EN 1090 EXC-2
Welding qualityEN ISO 3834-3
EnvelopeSandwich panel, PIR core 80 mm · λ ≈ 0.023 W/(m·K)
Fire resistanceEI-30 · tested to EN 13501-2
FloorMarine plywood on EPDM · R-10 slip rating
Electrical230 V / 50 Hz · TN-S · IEC 60364 compliant
HVACSplit inverter heat pump · MERV-8
Operating range−25 °C to +50 °C ambient
Wind ratingDesigned for 130 km/h basic wind (EN 1991-1-4)
TransportISO 668 footprint · CSC plate eligible (container variants)
Setup time4 hours · 2-person crew

Full drawings, calculation notes, DoP, O&M manual and FAT report included with every unit. Specs indicative — configurable to project requirements.

RELATED

More from mobile trailers

WhatsApp ile sohbet