OVERVIEW

Engineered once, deployable many times.

A mobile workshop trailer is a road-deployable industrial workshop configured for field equipment maintenance, fabrication, and repair at remote operating sites. structmod mobile workshop trailers serve mining and oil & gas operators establishing maintenance capability at remote exploration or production sites, military forces standing up vehicle and equipment workshops at deployed bases, infrastructure projects (utilities, road construction, renewable energy) requiring on-site workshop capability, and humanitarian deployments where fleet maintenance must be self-sufficient.

Standard configurations include workbenches with integrated vice positions (typical 3-6 m of bench length), mechanical workshop equipment (metal lathe, drill press, grinder, band saw — sized to maintenance scope), welding bay with TIG/MIG/stick capability and fume extraction per EN 12792, 3-phase electrical infrastructure (typical 32-63A per workshop bay), compressed air distribution to multiple service points, parts and tool storage with security infrastructure, and supporting facilities (operator washroom, small office for paperwork, climate control). Mechanical bay at one end of the trailer houses air compressor, welding power supplies, electrical distribution, and environmental control equipment.

structmod mobile workshop trailers serve sectors where road-deployable workshop capability supports the operational programme — mining site maintenance following the geological campaign across exploration locations, oil & gas maintenance at remote wellheads or pipeline operations, military vehicle workshops at deployed bases, infrastructure project fleet maintenance at multi-site projects, and humanitarian fleet maintenance during disaster response. Lead time is 10-12 weeks from contract signature for stock configurations. EN 1090 EXC-2 chassis, IEC 60364-1 commercial/industrial electrical with earth fault protection, fire safety per workshop fire-load classification, ventilation per industrial standards.

Typical deployment sequence

  1. Hour 0 — trailer arrives on tow vehicle, positioned and chocked
  2. Hour 0–1 — stabilizer jacks deployed, leveling verified
  3. Hour 1–2 — hydraulic walls or slide-outs extended where fitted
  4. Hour 2–3 — utility connections (power, water, wastewater)
  5. Hour 3–4 — functional test per FAT protocol
  6. Hour 4 — operational handover with user training
TECHNICAL SPECIFICATION

Spec sheet — STR-2370

Overall length13.0 m · 42.7 ft
Width (transport)2.55 m
Width (deployed)5.00 m
Height (transport)2.70 m
Floor area (deployed)65.0 m²
Dry weight12.0 t
ChassisEN 10025 S355JR hot-rolled steel · EN 1090 EXC-2
Welding qualityEN ISO 3834-3
EnvelopeSandwich panel, PIR core 80 mm · λ ≈ 0.023 W/(m·K)
Fire resistanceEI-30 · tested to EN 13501-2
FloorMarine plywood on EPDM · R-10 slip rating
Electrical230 V / 50 Hz · TN-S · IEC 60364 compliant
HVACSplit inverter heat pump · MERV-8
Operating range−25 °C to +50 °C ambient
Wind ratingDesigned for 130 km/h basic wind (EN 1991-1-4)
TransportISO 668 footprint · CSC plate eligible (container variants)
Setup time2 hours · 2-person crew

Full drawings, calculation notes, DoP, O&M manual and FAT report included with every unit. Specs indicative — configurable to project requirements.

RELATED

More from mobile trailers

WhatsApp ile sohbet