Level-2 field hospital
24-bed expandable field hospital, deployed 6 weeks from contract. Trauma bay, 2× OR, ICU, imaging, pharmacy. Operational within 48 h of site arrival.
Read full case study→Aşağıdaki her proje fabrikamızdan tam devreye alınmış, sahaya hazır ve belgeli olarak çıktı. Tüm ülkelerde tutarlı standart.
24-bed expandable field hospital, deployed 6 weeks from contract. Trauma bay, 2× OR, ICU, imaging, pharmacy. Operational within 48 h of site arrival.
Read full case study→38 mobile clinic and accommodation trailers dispatched from factory within 72 hours of the February earthquake. Full operation through winter.
Read full case study→220-person modular accommodation village, 3,800 m elevation. Wind-rated 160 km/h, thermal envelope for −20 °C nights.
Read full case study→4× expandable broadcast trailers for a European sports federation. Pop-out studio, control room, edit suites, satellite uplink.
Read full case study→Entegre BT, MR ve linac sığınaklı modüler onkoloji ünitesi. 9 haftada 18 bölümde teslim edildi.
Read full case study→Hardened mobile command and control trailer with fibre, SATCOM, EMP shielding. Deployable within 4 h.
Read full case study→References anonymised where confidentiality applies. Full list available under NDA.